Construction of general all-plant system of chemical water treatment of 75 m3/h capacity, with the execution of the following works:
- Projecting works
- Import, supply and equipment assembly:
- mechanical filters (sand), of 80 m3/h capacity
- coal filters, of 80 m3/h capacity
- softening installation of 24 m3/h capacity (production of Clack Corporation, Structural (USA))
- installation of water disinfection
- installation of three pairs of Grundfos pumps, of 75 m3/h, 50 m3/h, 24 m3/h capacity
- Assembling of automation and checking and measuring device
- Assembling of pipelines and armature
- Starting-up and adjustment works
Reconstruction of the system of chemical water treatment of the boiler-house, capacity 16 m3/h, with the execution of the following works:
- Projecting works
- Import, supply and equipment assembly:
- deaeration unit Gestra NDR 900 (Germany) of 16 m3/h capacity with automation, control panel and regulative and stop valve Gestra
- twin unit of softening of 16 m3/h capacity (production of Clack Corporation, Structural (USA))
- Assembling of automation and checking and measuring device
- Assembling of pipelines and armature
- Starting-up and adjustment works